0028
Location: Basel
Completion: 2009
Berrel Berrel Kräutler Architekten AG
Jürg Berrel, Maurice Berrel
Project: Veit Giessen
Project participants
Client: Industrielle Werke Basel IWB
Execution : Erne AG
Statics / construction planning : Rapp AG / Holinger AG
0028Water reservoir Bruderholz Basel
As part of the construction of the new water reservoir for the city of Basel on the Bruderholz hill, an associated operations building was also realized. From the vast volume of the water storage facility, only one floor of the operations building is visible above ground.
A connection between architectural strength and landscape integration was achieved by making the building itself an integral part of the park. Like a flat stone tableau, it rises crystalline from the vegetated slope, as if it were part of it.