0120
Location: Zürich
Competition 2012, 2nd Prize
Berrel Berrel Kräutler Architekten AG
Maurice Berrel
Competition: Annina Baumgartner, Tomas Ferreira, Daniel Kapr, Jaime Rodriguez
Project participants
Client: Hochbaudepartement Stadt Zürich
Landscape architecture: Hänggi Basler Landschaftsarchitektur
Construction engineer: Walt+Galmarini
HVAC engineer: Balzer Ingenieure
Electric planner: Bühlmann Engineering
Refrigeration technology: BBP Ingenieure
Bathing water technic: Schneider Aquatec
Visualisisations: maaars
0120Heuried Sports Centre Zürich
It proved necessary to replace the old Heuried Sports Centre with a new building. Joining the already existing facilities, consisting of a cloakroom, restaurant, administration offices, and technical and operational infrastructure, is a new ice-skating rink. The large outdoor swimming pool, along with the outdoor ice rink, was preserved. Given the minimal surface area for the lawn for the sunbathing lawn, the building footprint had to be kept as minimal as possible.