Berrel Kräutler Architekten Berrel Kräutler Architekten

University Muesmatt Bern

Urban planning schemes
Phases 1 + 2
Public centre on the ground floor
Axes
Landscape spaces

The placement of the elongated building in the centre of the provided space generates a profitable solution for all sides. A wide esplanade will be developped to the north of the building. As a counter­part, a recessed framed garden is to be created to the south. Along the Freie­strasse, three volumes separated by narrow passages are planned as replacement buildings.

View from the garden
View from the garden
Section through the garden
Section through the garden
Ground floor
Ground floor
Cross and longitudinal sections
Cross and longitudinal sections
Basement floor
Basement floor
Detailed section and facade
Detailed section and facade
Laboratory floor
Laboratory floor
→ Info
↓ Next

0279University Muesmatt Bern