Berrel Kräutler Architekten Berrel Kräutler Architekten

Heuried Sports Centre Zürich

0120

Heuried Sports Centre Zürich

Heuried Sports Centre Zürich

It proved neces­sary to replace the old Heuried Sports Centre with a new build­ing. Join­ing the already exist­ing facili­ties, con­sist­ing of a cloak­room, restau­rant, adminis­tration offices, and techni­cal and opera­tional infra­structure, is a new ice-skating rink. The large out­door swim­ming pool, along with the out­door ice rink, was pre­served. Given the mini­mal sur­face area for the lawn for the sun­bathing lawn, the build­ing footprint had to be kept as mini­mal as possible.

View from the sunbathing area
View from the sunbathing area
Ground floor plan with outdoor ice rinks
Ground floor plan with outdoor ice rinks
Narrative plan
Narrative plan
The ice rink during a hockey game
The ice rink during a hockey game

0120 Heuried Sports Centre, Zürich

Reference numbers
Competition: 2012, 2nd place

Project participants
Client: Hochbaudepartement Stadt Zürich 
Landscape architect: Haenggi Basler Landschaftsarchitektur

Construction engineer: Walt+Galmarini
Building technology: Balzer Ingenieure
Elektrical engineer: Bühlmann Engineering
Refrigeration technology: BBP Ingenieure
Water technology: Schneider Aquatec
Visualisation: maaars

Team BBK
Annina Baumgartner, Jaime Rodriguez, Tomas Ferreira, Daniel Kapr