Berrel Kräutler Architekten Berrel Kräutler Architekten

University Muesmatt Bern

0279

University Muesmatt Bern

University Muesmatt Bern

On the Muesmatt campus, archi­tecturally high-quality buildings are combined to form a large, well-functioning organism. It has, however, recently become apparent that the existing buildings can no longer meet the changed requirements of contemporary university operations. A new heart should help the complex to an unhindered future; a central core at which the available forces of the campus can come together, find support and mutually recharge each other. 

Urban planning schemes
Phases 1 + 2
Public centre on the ground floor
Axes
Landscape spaces

The placement of the elongated building in the centre of the provided space generates a profitable solution for all sides. A wide esplanade will be developped to the north of the building. As a counter­part, a recessed framed garden is to be created to the south. Along the Freie­strasse, three volumes separated by narrow passages are planned as replacement buildings.

View from the garden
View from the garden
Section through the garden
Section through the garden
Ground floor
Ground floor
Cross and longitudinal sections
Cross and longitudinal sections
Basement floor
Basement floor
Detailed section and facade
Detailed section and facade
Laboratory floor
Laboratory floor

0279 New building for natural sciences, university Muesmatt, Bern

Reference numbers
Competition: 2021
Code word: Nucleus

Project participants
Client: Amt für Grundstücke und Gebäude des Kantons Bern
Landscape architect: Bryum

Construction engineer: Dr. Neven Kostic
Building technology: Gruenberg + Partner
Electrical engineer: SSE Engineering
Building physics: Kuster + Partner

Laboratory planning: Dr. Heinekamp Labor- + Institutsplanung
Fire safety engineer: HKG Consulting

Visualisations: maaars

Team BK
Giulio Branca, Stasia Kremer, Sandra Ihasz, Lukas Burkhard